Commercial painting

Hospitality painting in Melbourne

Venues trade at the times most trades prefer to work. Programmes are built backwards from service, and finishes have to withstand cleaning regimes far harsher than a domestic interior.

What shapes work in this sector

The operational constraints that decide how the programme is built.

  • Programmed around service

    Work is scheduled around trading hours and function bookings, commonly early mornings or full venue closures.

  • Durable, cleanable finishes

    Systems are specified for high-traffic areas and frequent commercial cleaning.

  • Food-safe sequencing

    Kitchen and servery areas are isolated and cleaned down before handover.

What the work involves

A venue programme is built backwards from service. The available window is whatever sits between close and setup, and for most venues that is a small-hours block rather than a full day, so scopes are broken into pieces that can each be finished and cleaned within one window. Where a full closure is possible it is almost always cheaper per square metre, which makes it worth pricing both ways before assuming the venue has to stay open.

Kitchens and serveries are a different specification from the front of house. Surfaces there face heat, steam, grease and daily washdown, and need systems that tolerate that rather than a durable interior wall paint. Those areas also have to be cleaned down and formally handed back before food handling resumes, which takes time that belongs in the programme.

Front of house has moved to dark, saturated colours and exposed painted services: black ceilings, ductwork, conduit and structure. Both are more demanding than they look. Deep colours need more coats to reach an even film and show every preparation defect under the low, raking light most venues use, and spraying exposed services means masking everything that is staying, which is usually the larger part of the labour.

External areas carry the venue’s first impression and weather fastest. Al fresco structures, fixed umbrella frames, entry doors and signage surrounds take UV and rain the interior never sees, and they usually sit on a shorter recoat cycle than the rooms behind them.

Evidence

Awaiting content — no completed hospitality project is documented yet, so this page makes no sector experience claim. Documented case studies from other sectors are on the projects page.

Hospitality painting questions

Do we have to close to be painted?

Not necessarily, but it is worth pricing both ways. Working around service means small windows between close and setup, which suits a room-by-room scope. A short full closure is almost always cheaper per square metre, so the right answer depends on what a lost trading day costs against the difference in the quote.

What is used in the kitchen and servery?

Systems specified for heat, steam, grease and daily washdown rather than a standard durable interior paint. Those areas are also isolated, cleaned down and handed back before food handling resumes, and that handover time is written into the programme.

Why do dark colours cost more?

They need more coats to reach an even film, and they show preparation defects that a light colour hides, particularly under the low, raking lighting most venues use. The extra cost sits in the preparation and the additional coat rather than in the paint.

Can you paint exposed ceilings, ductwork and services?

Yes, and it is usually sprayed. The work in it is the masking: everything staying has to be protected before anything is applied, and on an exposed-services ceiling that masking is generally a larger part of the labour than the coating.

Related

Commercial work rarely sits in one sector. These are the closest neighbours to hospitality.

Other sectors

Talk to us about hospitality work

Tell us the site, the constraints and when we are allowed on it.